欧美一级爱爱_九九久久精品_日韩激情欧美_色婷婷综合久久久中文字幕

Kengbo Machinery and Nanjing Yaohang Construction Engineering Co., Ltd. re-engaged to create brillia

Grab the grab with the full-turn rig
Nanjing Yaohang Construction Engineering Co., Ltd. used 2 sets of shielded heavy-duty full-sleeve full-rotary drilling rigs (DTR2605H, DTR2005H) for construction, using a grab grab to match the soil for construction, the pile diameter is 1.5m, the pile depth is 85m, and the backfill is floated. The stone boulder formation, and finally into the middle weathered rock 19-20m, is one of the cast-in-place piles with complicated geological environment and difficult construction.

Grab the soil
 
Nanjing Yaohang Construction Engineering Co., Ltd. uses Kengbo Chong grab to take soil for construction, and the diameter of the boulder stone reaches 50-80mm.

Rotary drilling rig
 
Nanjing Yaohang Construction Engineering Co., Ltd. uses a rotary drilling rig to cooperate with the shielded heavy-duty full-sleeve full-rotation drill (DTR2605H), and finally enters the medium-weathered rock of 19-20m. The geological predicament is complex and the construction is difficult.

Rotary drilling rig
Nanjing Yaohang Construction Engineering Co., Ltd. uses a rotary drilling rig to cooperate with Dunan Heavy Industry full casing full-rotation drill (DTR2005H), and finally enters the middle weathered rock 11-12m. The geological predicament is complex and the construction is difficult.
 
Perfusion, hole formation, transfer positioning
Nanjing Yaohang Construction Engineering Co., Ltd. casts the pile into the hole and moves the machine.
主站蜘蛛池模板: 屯昌县| 巢湖市| 北票市| 沈阳市| 江山市| 清远市| 丹棱县| 晋中市| 宜春市| 临沧市| 北安市| 化德县| 醴陵市| 合江县| 元朗区| 东乌珠穆沁旗| 开鲁县| 柳河县| 西丰县| 恩施市| 五指山市| 江油市| 当阳市| 奉节县| 明光市| 郸城县| 图木舒克市| 子长县| 梁平县| 永安市| 建昌县| 诸城市| 尼木县| 屏山县| 民丰县| 留坝县| 紫阳县| 城市| 巴马| 个旧市| 永顺县|